SCM Damping?shock absorber?Installation instructions
瀹夎鍓嶏紝璜嬬⒑瑾嶆窞姹熼泦鍦樻鑶犲綀绨ф笡闇囧櫒鐨勫瀷铏熷拰瑕忔牸鏄惁姝g⒑銆�
Before installation,make sure the model and the specification are correct.
瀹夎瑾槑
Installation guide
鎵€闇€宸ュ叿锛歁10銆丮12銆丮14銆丮16銆丮20闁嬪彛鎵虫墜銆�
Required tools锛歁10銆丮12銆丮14銆丮16銆丮20 open wrenches.
妾㈡煡闄勪欢鏄惁榻婂叏锛屽綀绨ф笡闇囧櫒鏄惁鏈夌己闄锋垨鐮存悕銆傦紙濡傚湒1锛�
Check the isolator and other accessories see if they are all completely or having any defects.(Fig 1)
灏囧綀绨ф笡闇囧櫒鏀惧埌瑷倷鐨勫畨瑁濅綅缃�銆傦紙濡傚湒2锛�
Place the isolator on the correct installation position.(Fig 2)
閹栫穵铻烘瘝鍜屽鐗�锛岀⒑淇濊ō鍌欏拰褰堢哀娓涢渿鍣ㄥ浐瀹氬埌浣�銆傦紙濡傚湒3锛�
Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.(Fig 3)
瀹夎鍚庤珛妾㈡煡褰堢哀涓嬪閲忥紝濡傚綀绨у鍒板簳锛屽墖琛ㄧず鑽烽噸涓嶈冻锛屾矑鏈夋笡闇囨晥鏋溿€傛噳瑭叉洿鎻涜純澶ц嵎閲嶇殑褰堢哀娓涢渿鍣ㄥ瀷铏�锛屽苟璜嬩簬鏈叕鍙告キ鍕欎汉鍝¤伅绯�銆�
After the adjustment,check the press amount of the spring.If it appears with insufficient loading,please replace with bigger loading by contacting our staff.
瀹夎鏅� 璜嬫敞鎰忓畨鍏ㄣ€�
Be cautious during the installation.
SCM鍨嬪綀绨ф笡闇囧櫒瀵︾墿锛�
SCM type shock absorber parameter table:
SCM鍨嬪綀绨ф笡闇囧櫒绲愭鍦栵細
SCM type shock absorber Structure drawing:
SCM鍨嬪綀绨ф笡闇囧櫒鍙冩暩琛細
SCM type shock absorber parameter table:
鍨嬭櫉 Type |
鏈€澶ц級鑽� Optimum load锛坘g锛� |
澶栧舰灏哄?Dimensions锛坢m锛� | ||||||
H | D | L1 | L2 | d | d1 | |||
SCM-10 | 10 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-20 | 20 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-30 | 30 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-40 | 40 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-60 | 60 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-80 | 80 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-120 | 120 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-160 | 160 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-240 | 240 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-320 | 320 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-480 | 480 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-640 | 640 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-820 | 820 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1000 | 1000 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1280 | 1280 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1500 | 1500 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-2000 | 2000 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-2700 | 2700 | 160 | 320 | 192 | 240 | 20 | / | |
SCM-3500 | 3500 | 160 | 320 | 192 | 240 | 20 | / | |
SCM-4800 | 4800 | 160 | 320 | 192 | 240 | 20 | / |
淇濋闋堢煡锛氭瘡鏈堣瑙€瀵烠S鍥哄畾铻烘爴鏄惁鏈夋澗鍕�锛屼繚鎸佸綀绨ф笡闇囧櫒瀹夎鏅傚綀绨т笅澹撴挀搴︽槸鍚︽甯�銆�
Maintenance checking points:remain M12 fixed bolt locked,balance of the base,installation of the isolator,and the deflection of the spring.
鍦�1锛夋鏌ラ檮浠舵槸鍚﹂綂鍏�锛屽綀绨ф笡闇囧櫒鏄惁鏈夌己闄锋垨鐮存悕銆�
Fig 1锛塁heck the isolator and other accessories see if they are all completely or having any defects.
鍦�2锛夊皣褰堢哀娓涢渿鍣ㄦ斁鍒拌ō鍌欑殑瀹夎浣嶇疆銆�
Fig 2锛塒lace the isolator on the correct installation position.
鍦�3锛夐帠绶婅灪姣嶅拰澧婄墖锛岀⒑淇濊ō鍌欏拰褰堢哀娓涢渿鍣ㄥ浐瀹氬埌浣�銆�
Fig 3锛塅asten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.